Once again I had the enjoyable challenge to turn a basement into a lovely family sauna and bathroom including space for washing machines etc. Family had just bought the house and they hoped that sauna would be finished before they moved in. Therefore this was a very quick and energetic process which benefited from the family's quick decision making skills.
Family had requested a large sauna suitable for conversation and a double shower. Also a space for changing clothes was on their wish list. I prepared three different layouts for the basement area. One of the plans stood out for the family and we developed it further. Once the plan was finalized I assisted the family to source the materials locally as we could not have long lead times for any of the products. All in all the project took 3 months to complete and they got a lovely sauna, bathroom and utility room with minimum wait.
A little extra design exists in the shower. Between the showers you have a colonne with beautiful tile. Inside it you have shelves for shampoos etc. They are available from both sides but are not visible from the general view!
It is possible to have a beautiful bathroom with materials that you can source from shops right away and minimize the risk of delays.
 |
utility room's glass door is like a light element |
 |
sauna to enjoy |
 |
Double shower with colonne |
 |
Changing area on right. Notice smaller tiles where the floor is wet. |
 |
Utility room |
 |
colonne from inside |
 |
Utility room and shower, before... |
 |
Sauna, before... |
Ei kommentteja:
Lähetä kommentti